EURAXLES: Minimizing the risk of fatigue failure of railway axles

Acronimo: EURAXLES

Data di inizio

2010-11-01

Data di fine

2014-04-30

Capofila/Coordinatore

UNION DES INDUSTRIES FERROVIAIRES EUROPEENNES - UNIFE (BE)


Abstract

EURAXLES is a 3 year R&D project uniting 23 partners across Europe including 6 axle manufacturers, 4 railway operators/IMs, 2 system integrators, 3 technology suppliers, 5 universities, 2 rail sector associations and 1 consulting firm. The consortium is well-positioned to provide a common R&D approach to axle design, protection, inspection and maintenance which will have an impact on standards, regulations and on the market. EURAXLES aims to develop innovative, safer solutions for railway wheelsets with improved reliability in a cost effective way. The research is summarized below. 1. A design approach will be developed, including a risk analysis method which could offer a simple design route by combining loads with difference occurrences including loading specificity of vehicles and service conditions together with the axles resistances, including new materials and methods in order to predict the ‘failure probability’. 2. New developments will also include (i) improved axle protection against corrosion, including protection of already corroded axles; (ii) improved adhesion of coatings with a study of the roughness influence (adhesion and fatigue behavior); and (iii) new, innovative coating solutions. The new solutions will also aim to fulfill environmental requirements to avoid or limit VOC emissions. 3. New/improved NDT inspection methods will allow the in-service inspection of axles in order to guarantee safe service conditions with a low impact on the vehicle availability. 4. A RAMS/LCC analysis of the solutions will be carried out. The railway transportation system requires a risk analysis of the safety components. Activities will improve design validation and inspection technologies of axles which will optimise costs, safety and environmental compliance to be shown with RAMS/LCC analyses. Results will be disseminated to the different stakeholders and the European standards/regulations for railway axles and wheelsets will be improved across Europe.


Programma

FP7-TRANSPORT

Call

FP7-SST-2010-RTD-1


Partecipanti Pugliesi
Partner Ruolo Contributo UE Referente
Mer Mec Spa Partecipante 66,091.00€ Annamaria Cavaliere

Partner Ruolo Paese
TRENITALIA SPA Partecipante IT
UNIVERSITA DEGLI STUDI DI UDINE Partecipante IT
DEUTSCHE BAHN AG Partecipante DE
ANSALDOBREDA S.P.A. Partecipante IT
ULTRASEN SISTEMAS SL Partecipante ES
METALOGIC N.V. A.I. TECHNOLOGIES & ENGINEERING Partecipante BE
Radsatzfabrik Ilsenburg GmbH Partecipante DE
ALSTOM TRANSPORTE SA Partecipante ES
FRAUNHOFER GESELLSCHAFT ZUR FOERDERUNG DER ANGEWANDTEN FORSCHUNG E.V. Partecipante DE
Construcciones y Auxiliar de Ferrocarriles, S.A. Partecipante ES
LUCCHINI RS SPA Partecipante IT
VALDUNES SAS Partecipante FR
ECOLE NATIONALE SUPERIEURE DE CHIMIE DE LILLE Partecipante FR
SNCF MOBILITES Partecipante FR
GUTEHOFFNUNGSHUTTE RADSATZ GMBH Partecipante DE
Bonatrans Group a.s. Partecipante CZ
POLITECNICO DI MILANO Partecipante IT
UNION INTERNATIONALE DES CHEMINS DE FER Partecipante FR
WAVESTONE ADVISORS Partecipante FR
ALSTOM TRANSPORT S.A. Partecipante FR
UNIVERSIDAD CARLOS III DE MADRID Partecipante ES
Renfe Operadora Partecipante ES

Budget Totale

4,721,150.00€

Contributo UE

2,899,998.00€